
On June 20, 2025, with the completion of the final stand apron concrete pour, Terminal H, with its elegant silver-gray outline, was embedded at the edge of the desert. On June 30, the Terminal H project, managed and implemented by CACCI Saudi Branch, was





Airfield Reference Code——4F Number of Runway——4 (4000×60/3400 ×60/3800×60/3800×60) Terminal Area——622,000 square meters

Airfield Reference Code——4F Number of Runway——3 (3800×60/3800×60/3600×45) Terminal Area——1,403,700 square meters

Airfield Reference Code——4F Number of Runway——5 (including 1 military and civilian shared runway) Terminal Area——700,000 square meters
China Airport Construction Group Corporation (CACC), established in 1954, is affiliated with the Civil Aviation Administration of China (CAAC). It is one of the most qualified, capable, and largest airport construction enterprises both domestically and globally. Over the years, it has accumulated extensive experience in airport construction and established a strong and reputable brand in the industry.
CACC International serves as the overseas business platform of the China Airport Construction Group, fully responsible for the development and implementation of both domestic and international EPC (Engineering, Procurement, and Construction) projects, as well as overseas business operations.
General Contracting
Colin Liu
0534425804
liuhao@caccintl.com.cn
Building No. 7835, Omar Ibn Abdullateef Street, Al Rimal Dist, P.O.Box 13436, Riyadh, KSA
www.cacc-intl.com.cn