CHINA PETROLEUM PIPELINE ENGINEERING CO. LTD.(Saudi Branch)
CHINA PETROLEUM PIPELINE ENGINEERING CO. LTD.(Saudi Branch)
  • 1989

    North Gas Compression Pipelines Project

    The project including 934.31km onshore pipelines and 2 Main Line valve stations.

  • 1989

    Saudi Aramco Re-Route Pipeline in Ras-Tanura Area

    The project is located near Dammam and the owner is Saudi Aramco. It is on-going project, including 250km onshore pipelines and more than 220 hot tapping operations. The scope of work is EPC.

  • 1989

    Niger Agadem Field Surface Facilities Project

    The project is located in the hinterland of the Sahara desert. Including 1 oil field united stations, 1 oil gas transfer station, 5 metering station, 22 Wells and more than 200 KM pipelines with 1x106tons/ year production capacity .The scope of work is EP

  • 1989

    Tanzania Natural Gas Pipeline Project

    The project was located Mtwara City, Tanzania. The total length is 542km including 36" x 513 km onshore pipeline and 24" x29 km offshore pipeline. The scope of work include survey,basic design and EPC.

  • 1989

    China West-East Natural Gas Pipeline Project

    This project was started from 2002 and completed in 2014 including three phases. The total length of pipeline over 20,000km with dimension are 40’ and 48’. The scope of work include survey,feasibility study,basic design and EPC.

Company

China Petroleum Pipeline Engineering Co., Ltd (CPP) is committed to becoming a world-class, integrated storage and transportation service provide for oil and gas. We are dedicated to providing quality services and harmony. We are dedicated to providing quality services and creating value for our clients.    

We are constantly developing to meet global demand with our high-end, special, and differentiated services. We can help our clients every step of the way, from consultation, to design, to procurement, to construction, to start-up, operation and maintenance; we also provide research and development services and machinery. Manufacturing. We are able to provide help to build and manage facilities throughout the lifecycle of the products as well as one-step service for our clients.

We have many projects on going and accepted the award due to the excellent “Saudization Training” from the Saudi government in 2018.Meanwhile, SAUDI Aramco express its appreciation to CPP for achievement on reaching  Two(2)Million Safe Man-Hour without a ”Lost Time Injury” and Zero Fatalities  of Reroute Pipeline in Ras Tanura Area.

Business Scope

Onshore & Offshore Pipeline Oil& Gas Storage LNG Processing and Receiving Terminals Technical Services,Oil & Gas Field Facilities, Refinery, Telecommunication& Power.